- Original Caption Released with Image:
-
Left to right: Electrical Test Engineer Esha Murty and Integration and Test Lead Cody Colley prepare the ASTERIA spacecraft for mass-properties measurements in April 2017 prior to spacecraft delivery ahead of launch. ASTERIA was deployed from the International Space Station in November 2017. For more information about CubeSat see www.jpl.nasa.gov/cubesat/.
- Image Credit:
-
NASA/JPL-Caltech
Image Addition Date:
-
2020-01-03
|