PIA10673: Water Hammer Test
 Mission:  Phoenix
 Product Size:  516 x 370 pixels (w x h)
 Produced By:  Lockheed Martin Space
 Full-Res TIFF:  PIA10673.tif (573.6 kB)
 Full-Res JPEG:  PIA10673.jpg (36.07 kB)

Click on image above for all movie download options

Original Caption Released with Image:

Click here for movie of PIA10673
Click on the image for the animation

This video shows the propulsion system on an engineering model of NASA's Phoenix Mars Lander being successfully tested. Instead of fuel, water is run through the propulsion system to make sure that the spacecraft holds up to vibrations caused by pressure oscillations.

The test was performed very early in the development of the mission, in 2005, at Lockheed Martin Space Systems, Denver. Early testing was possible because Phoenix's main structure was already in place from the 2001 Mars Surveyor program.

The Phoenix Mission is led by the University of Arizona, Tucson, on behalf of NASA. Project management of the mission is by NASA's Jet Propulsion Laboratory, Pasadena, Calif. Spacecraft development is by Lockheed Martin Space Systems, Denver.

Photojournal Note: As planned, the Phoenix lander, which landed May 25, 2008 23:53 UTC, ended communications in November 2008, about six months after landing, when its solar panels ceased operating in the dark Martian winter.

Image Credit:
NASA/JPL-Caltech

Image Addition Date:
2008-05-24