PDS logoPlanetary Data System
PDS Information
Find a Node - Use these links to navigate to any of the 8 publicly accessible PDS Nodes.

This bar indicates that you are within the PDS enterprise which includes 6 science discipline nodes and 2 support nodes which are overseen by the Project Management Office at NASA's Goddard Space Flight Center (GSFC). Each node is led by an expert in the subject discipline, supported by an advisory group of other practitioners of that discipline, and subject to selection and approval under a regular NASA Research Announcement.
Click here to return to the Photojournal Home Page Click here to view a list of Photojournal Image Galleries Photojournal_inner_header
Latest Images  |  Spacecraft & Technology  |  Animations  |  Space Images App  |  Feedback  |  Photojournal Search  

PIA00529: VL1 Digs A Deep Hole On Mars
 Target Name:  Mars
 Is a satellite of:  Sol (our sun)
 Mission:  Viking
 Spacecraft:  Viking Lander 1
 Instrument:  Camera 1 
 Product Size:  249 x 512 pixels (w x h)
 Produced By:  JPL
 Producer ID:  P18601
 Addition Date:  1997-01-09
 Primary Data Set:  Viking EDRs
 Full-Res TIFF:  PIA00529.tif (59.61 kB)
 Full-Res JPEG:  PIA00529.jpg (26.65 kB)

Click on the image above to download a moderately sized image in JPEG format (possibly reduced in size from original)

Original Caption Released with Image:

VIKING LANDER DIGS A DEEP HOLE ON MARS -- This six-inch-deep, 12- inch-wide, 29-inch-long hole was dug Feb. 12 and 14 by Viking Lander 1 as the first sequence in an attempt to reach a foot beneath the surface of the red planet. The activity is in the same area where Lander 1 acquired its first soil samples last July. The trench was dug by repeatedly backhoeing in a left-right-center pattern. The backhoe teeth produced the small parallel ridges at the far end of the trench (upper left). The larger ridges running the length of the trench are material left behind during the backhoe operation. What appears to be small rocks along the ridges and in the soil at the near end of the trench are really small dirt clods. The clods and the steepness of the trench walls indicate the material is cohesive and behaves something like ordinary flour. After a later sequence, to be performed March 1 and 2, a soil sample will be taken from the bottom of the trench for inorganic soil analysis and later for biology analysis. Information about the soil taken from the bottom of the trench may help explain the weathering process on Mars and may help resolve the dilemma created by Viking findings that first suggest but then cast doubt on the possibility of life in the Martian soil. The trench shown here is a result of one of the most complex command sequences yet performed by the lander. Viking l has been operating at Chryse Planitia on Mars since it landed July 20, 1976.

Image Credit:
NASA/JPL

Image Addition Date:
1997-01-09